Infrastructure of Info-Network

Achievements

- A “raised floor”, a fire alarm, a fire extinguishing system and internal electricity panel to the main network room were made.

  - To provide protection for the central network resulting from what is happening of the disruption and volatility of electricity during the installation of the UPS + Stabilizer + Generator.

 - To provide servers and online technical support for the projects.

 - To connect the internet service for the university administration, the faculty of veterinary medicine, the faculty of tourism and hotels, the institute of genetic engineering and the Institute of environmental research for post graduate Studies.

  - Installation and configuration the required work for the devices supplied by the ICTP.

  - To supervise the installation of nearly 500 points.

  - Installation more than 200 points in the university administration, the faculty of tourism and hotels, the institute of genetic engineering and the university cities administration (by the network engineers).

 - To provide technical support to projects and the university employees.

 - Work to solve any problem related to the network and the internet at the university, the faculties and university cities.